02/03/2017
Location: Districts 2, 7, Nha Be, Ho Chi Minh City
Capital source: French ODA
Client: DUMEZ-GTM (now renamed to VINCI) - France
Main feature: Construction of transmission pipeline from Thu Duc BOO water treatment plant along Hanoi highway, crossing district 2, Sai Gon river to district 7, then going to Nha Ba district. Pipe diameters from D 2000mm – D900m; Length = 26.7km
Services provided: VIWASE cooperation with French company to study, hydraulic calculation, check pipe size and undertake detailed design for the project