Sai Gon River Water Supply System Project

  03/03/2017

Location: Ho Chi Minh
Capital source: State budget
Client: Sai Gon River Water Supply System Project Stage 1 PMU 
Main feature: Construction of water treatment plant stage 1, capacity of 300,000m3/d; Transmission and distribution network
Services provided: VIWASE formulated feasibility study, design and prepare tender document for the project.
 

Stage 2: VIWASE formulated feasibility study, design and prepare tender document for EPC contract for  the water supply system stage 2, capacity of 300,000 m3/d

 